Solutions
Sep 2026
340 MWh combined deployed as a fleet of distributed grid-support BESS units — each site repeatable, bankable and delivered on the same proven SunTera platform.
Australia Utility-Scale Energy Storage Project
Location: Multi-sites Australia
340 MWh
Capacity
Aug 2026
Solar-coupled BESS -firmingrenewable generation·NSW
Hybrid Solar + Storage Plant
Location: NSW, Australia
10.5MWh
Capacity
Aug 2026
Grid-support BESS · QLD
Grid-support BESS Project
Location: QLD, Australia
16.72MWh
Capacity
Dec 2025
Off-grid minesite power · regional WA·SunTera G2 + NR PCS
Off-Grid Minesite Project
Location: WA, Australia
Capacity
Feb 2025
This project deploys a 20-foot SunTera liquid-cooled energy storage system integrated with centralized PCS and an intelligent control system, enabling a highly integrated solution that enhances grid stability and operational efficiency. The project demonstrates Jinko ESS’s advanced energy technology capabilities and commitment to advancing renewable energy development in the Asia-Pacific region.
Australia Utility-Scale Energy Storage Project
Location: Australia
5MW/12MWh
Capacity
Apr 2024
This is the first large-scale project in French Polynesia that combines agriculture with renewable energy.
Tahiti Energy Storage System
Location: Tahiti, France
8.6MW/17.2MWh
Capacity