Solutions
Sep 2025
• 1 × SunGiga 215kWh
• Behind-the-meter site benefits
• FCAS + wholesale market participation
Commercial Business Park
Location: Melbourne, VIC
Capacity
Aug 2025
• 2 × SunGiga 215kWh units
• Aged - care w/ embedded network
• FCAS + wholesale market; Powersync VPP
Embedded-Network VPP
Location: QLD, Australia
Capacity
Jul 2025
• 1× SunGiga + Powersync VPP
• Aged-care w/ embedded networks
• FCAS + wholesale market participation
Front-of-meter BESS
Location: Maroochydore, QLD
Capacity
Apr 2025
• 1× SunGiga + Solgen EMS
• Tariff arbitrage (no FCAS)
• PV day + off-peak at night; AM/PM peak discharge
Regional Reliability
Location: Mt Gambier, SA
Capacity
Feb 2025
This project deploys a 20-foot SunTera liquid-cooled energy storage system integrated with centralized PCS and an intelligent control system, enabling a highly integrated solution that enhances grid stability and operational efficiency. The project demonstrates Jinko ESS’s advanced energy technology capabilities and commitment to advancing renewable energy development in the Asia-Pacific region.
Australia Utility-Scale Energy Storage Project
Location: Australia
5MW/12MWh
Capacity
Apr 2024
This is the first large-scale project in French Polynesia that combines agriculture with renewable energy.
Tahiti Energy Storage System
Location: Tahiti, France
8.6MW/17.2MWh
Capacity