• 2 × SunGiga 215kWh units
• Aged - care w/ embedded network
• FCAS + wholesale market; Powersync VPP
Aged facility
Location: QLD, Australia
Capacity
Sep 2025
The Romania Zorline project represents a significant milestone in Jinko ESS’s expansion in Southeast Europe. The project deploys three SunTera G1 liquid-cooled energy storage systems with a total capacity of 10.32 MWh to support grid stability and renewable energy integration. Designed for Romania’s challenging climate conditions, the systems feature an intelligent battery management system, five-layer safety protection, an IP55 rating, and advanced liquid-cooling technology that keeps cell temperature differences within 2.5°C. The project demonstrates Jinko ESS’s commitment to advancing the region’s clean energy transition.
Romania Zorline Project
Location: Romania
6.58MW/10.32MWh
Capacity
Sep 2025
Located at the MGP mining site in Masbate Province, Philippines, this project features an innovative 1C-rated energy storage microgrid system supporting sustainable mining operations. The system operates in coordination with an 8.1 MW PV plant, substantially reducing reliance on diesel generators. Its intelligent controller forecasts PV generation and proactively optimizes diesel generator dispatch to ensure a stable and reliable power supply. The solution reduces the load on existing diesel generators while improving project economics through lower fuel consumption and O&M costs, offering a cleaner and more efficient energy solution for the mining industry.
Masbate Gold Mine Microgrid Energy Storage Project
Jinko ESS deployed a utility-scale energy storage system for Athens International Airport (AIA) to support its 2025 carbon neutrality target. Upon completion, AIA will become the operator of the largest self-consumption system among airport facilities worldwide and the first international airport to achieve 100% energy self-sufficiency. The project is also Greece’s first utility-scale energy storage system integrated with a PV plant.
Greece Utility-Scale Energy Storage Project
Location: Greece
21.95MW/123.84 MWh
Capacity
Aug 2025
• 2 × SunGiga 215kWh units
• Aged - care w/ embedded network
• FCAS + wholesale market; Powersync VPP
This project combines SunTera G2 5 MWh systems with a 2.5 MW PCS medium-voltage step-up solution to provide two hours of energy storage duration. As Jinko ESS’s first utility-scale project in Thailand, it highlights the company’s capability to deliver complex grid-side solutions and supports the continued development of clean energy in Thailand.
We use cookies to improve the functionality and performance of our website. By using them, we can enhance your browsing experience and track website traffic. For more information, please visit our Privacy Policy.